Biomass Pyrolysis Lab Apparatus for Torrefied Pellet Project

By:Mr Evan Wang
Position:Managing Director
Dec 26, 2023
Biomass pyrolysis refers to the process of biomass thermochemical conversion under anaerobic state (isolated with air). During this process, it will produce biochar, tar, pyroligneous and syngas. By controlling the pyrolysis reaction conditions (mainly reaction temperature, dwell time and so on), we can get different kinds of pyrolysis products: gas, solid and liquid.
 
Biomass Pyrolysis Laboratory Apparatus is developed to help the clients, who will set up commercial biomass pyrolysis projects, to collect the relevant experimental data for further analysis and research, then improve commercial operation.
Simec Biomass Pyrolysis Laboratory Apparatus
 
Syn Gas Combustion in Laboratory
 
As the sole supplier of technology & equipment for 5 tons/hour torrefied biomass pellets project invested by Sweden investors, SIMEC delivered biomass pyrolysis laboratory apparatus and laboratory chopper/hammer mill/pelletizer to project site in January 2019.
The purpose is to conduct torrefaction experiments and make samples of torrefied biomass pellets. The samples will be sent to customers in Europe for co-firing test. This is a very important step before setting up large scale torrefied pellet project.
 
Realizable Experiments includes:
  • Torrefaction and other pyrolysis process under different reaction temperature and material flow rate.
  • Collectable experimental samples for further analysis: torrefied solid material; syn-gas before purification; syn-gas after purification; liquid byproduct, such as tar, pyroligneous acid.
  • Instant syn-gas volume measurement.
  • Experimental study on combustion of syn-gas before and after purification.
  • Based on the samples, data, analysis, by scientific calculation, almost all the experimental purposes could be realized to meet the requirements of scientific research work.
SIMEC will build 25 sets of 5 t/h torrefied biomass pellet plants in the following years for the same Europe energy company.
 
All the cargos were loaded into container at 3rd Jan. 2019.
Biomass Pyrolysis Laboratory Laboratory Apparatus
 
Biomass Pyrolysis Laboratory Apparatus Feeding Auger
 
Biomass Pyrolysis Laboratory Apparatus Screw Feeder
 
Biomass Pyrolysis Laboratory Apparatus Loading
 
PACKING LIST DETAILS
No. Model Details Weight
(t)
Size (L*W*H)
(mm)
Remarks
Item Unit Qtty
SIMEC01 CF158 Hammer Mill Set 1 0.095 610*515*570 Including:
1 set of motor;
1 set of feeding hopper;
1 piece of tube;
1 set of air bellow;
12 pieces of hammers;
5 pieces of screens (hole diameter 6mm);
1 set of discharging chute;
2 pieces of belts;
1 piece of belt guard;
1 set of frame;
1 set of installation tools and bolts.
SIMEC02 KL200B Pellet Press Set 1 0.22 1000*430*960 Including:
1 set of motor;
1 set of control cabinet;
1 set of feeding hopper;
1 set of discharging chute;
1 set of flat die(hole diameter 6mm);
2 sets of integrated rollers (4 pieces); 
1 set of installation tools and bolts.
SIMEC03 BPLA133-1 Feeding Auger Piece 1 0.214 2088*1900*400 Including:
1 set of motor;
1 set of sluice valve;
1 set of hopper;
1 piece of position selector valve.
SIMEC04 BPLA133-2 Discharging Screw Piece 1 0.052 1500*200*300 Including: 1 set of motor.
SIMEC05 BPLA133-3 Pyrolysis Reactor Piece 1 0.338 2500*600*1800 Including: 1 set of motor.
SIMEC06 BPLA133-4 First Biochar Tank Piece 1 0.166 1200*1300*800 including:
1 set of sluice valve; 
1 piece of position selector valve.
SIMEC07 BPLA133-5 Gas Purification System Piece 1 0.628 2700*900*2200 In the water tank there are the following elements:
1. One set of second charcoal case (including: 1 set of installation tools, gasket of various models(DN125 、DN80 DN50 square gasket, thermocouple connecting line), 1 set of connecting blots, 1 hey cutter cabinet, 1 piece of hey cutter cable, 1 piece of air compressor cable, 1 piece of flexible conduit, 1 set of pressure sensor module, 1 piece of pressure sensor connecting line);
2. Two pieces of φ50、φ20 plastic steel wire pipes;
3. Two pieces of flange joints;
4. Reactor and purification unit connecting tube;
5. One set of charcoal discharging screw support;
6. One set of hey cutter accessories: 2 pieces of triangular belts, 1 piece of oil pot, 2 pieces of cutters, 2 pieces of wrenches;
7. One set of air compressor;
8. One piece of φ8 air pipe;
9. Two pieces of sampling port connectors.
10. Gas burner.
SIMEC08 BPLA133-6 Control Cabinet Piece 1 0.098 800*500*2000 1. The key is in the left inner side of cabinet;
2. Packaged in wooden case
SIMEC09 9zt-0.4 (250) Grass
Shredder
Set 1 0.066 1100*500*800 Including:
1 set of motor;
1 piece of belt guard.
    TOTAL
AMOUNT
  9
PCS
1.877
Tons
  All loaded in one 20'GP container.
 